chinese
 
¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡¡Products£º
 
 
  Outdoor Shelter Cabinet Products  
 


+
General
+ Main Body System
¡¡+ Disperse Installation
¡¡+ Whole Cast
+ Outdoor Shelter Base
+ Shelter Assemblies System
¡¡+ Cable Lead-in System
¡¡+ Light System
¡¡+ Thunderbolt Protection
¡¡¡¡System

¡¡+ Power System
¡¡+ Special Air Conditioner
¡¡+ Intelligence
¡¡¡¡Ventilating System

¡¡+ Fireproof System
¡¡+ Other Accessories
+ Environment Intelligence
¡¡Control

+ Applications of Outdoor
¡¡Cabinet

 


General

 


With the development of telecommunication technology, the needs of telecom applications are multiplicity and individuality, 3G technology make constructure of next telecommunication network become more complex, covered area of single station¡¯s signal is becoming narrow, but the need of covered area is becoming more wide, So we must increase more stations. Many problems of traditional stations¡¯ model are restricting the development of 3G. meanwhile 3G technology proposed high performance, low costs to dispose, the demand of the gradual progress that face the future flexibly to 3G base station. Under the new demand of 3G,the products high adaptability and meet the directions of different complicated wireless environments to build.

According to above-mentioned requirements and overseas experience, the integrated solution of outdoor shelter includes the room material and cabinet system which suitable for various outdoor environments, cable lead-in system, light system, grounding & lighting protection system, power management system, temperature control system, fire control system, telecommunication accessories system, environment intelligent monitoring system. This solution includes different demand of planning and application occasion.

Outdoor shelter can be installed in field, coteau, top of building. Becase of speed assembly, short construct period, cost saving, easy to move, so operators like use it instead of traditional shelter. At the same time, decrease management cost, shorten construct period of integrated solution gained the favor of the operator. Meanwhile, integrated solution will reduce the management cost of operator select apparatus type, purchase and project implement, shorten constructing period, According to national reduce energy sources and emission control regulations, we adopt new materials of shelter body and energy reduce ventilating system, saving electricity power largely.
 

 

 
Copyright © 2006-2008 Dongzhou Group. All rights reserved.